guides

funded and contracted WTE

Two numbers sit behind every post: what the budget pays for, and what the people in it are contracted for. The gap between them is one of the first things a planner looks at, and one of the easiest to misread.

two numbers for every post

  • Funded WTE is what the budget pays for. A signed-off post with nobody in it still has its funded WTE, for example 1.0.
  • Contracted WTE is what the people in the post are contracted for. It comes from the postholders, so it is 0 when the post is vacant.

When the two match, the post is filled as funded. When they differ, the difference has a meaning.

reading the gap

  • Funded above contracted is a vacancy. A post funded at 1.0 with a postholder at 0.6 has 0.4 WTE vacant, even though the post looks filled.
  • Contracted above funded is unfunded hours. A post funded at 0.8 with a postholder at 1.0 has 0.2 WTE the budget does not pay for.
  • A job share is two posts that add up. Post A funded at 1.0 and contracted at 0.6, and post B funded at 0 and contracted at 0.4: together the job is fully funded and fully filled, even though post B on its own shows 0.4 unfunded.

Added up for a team or a directorate, funded against contracted WTE shows how much of the establishment is really staffed, and where hours are being worked that the budget does not cover.

what the gap does not show

  • Someone away is still contracted. A postholder on secondment or long-term leave keeps the post filled, so the contracted WTE does not fall, but the hours are not worked. Look at periods away and how the post is covered, as well as the gap.
  • Funded is not the same as needed. A fully staffed establishment can still be short of what the service needs. Set a staffing standard to compare the need with both.
  • Frozen and proposed posts count differently. A frozen post keeps its place in the establishment but must not be filled; a proposed post is not yet in it. Totals should say which they include.

in Workforce Planner

Every post holds both numbers, and contracted WTE is worked out from the postholders, never typed in. The structure view can be coloured by the gap between them, with totals at every level, for any month past or planned, and forecasts project both month by month, with staffing need beside them. It works in the free demo for up to 50 posts.

see your own structure, then plan it

Any organisation can try Workforce Planner free in the demo, with up to 50 posts: enough to load a ward or a small team, see its structure, forecast it, and test options. Send us a request and we will be in touch to set up your organisation.

request demo access book a 20-minute walkthrough see pricing and discounts